Area served · Grand Traverse County

Home design in Garfield Township.

Custom homes, additions, garages, and site plans for Garfield Charter Township, with drawings prepared for the township offices that will review them.

Garfield Township wraps around much of Traverse City, and much of it has Traverse City mailing addresses. It is the one township in Grand Traverse County that runs its own building department, and it also runs its own soil erosion program and stormwater rules. So a Garfield project is reviewed by the township, not the county construction code office.

Here is how a home project moves through the township, what each office looks at, and the zoning rules that most often shape a design.

Permits are applied for by the owner or builder. We don't apply for or manage permits.

Is your lot in Garfield?

A Traverse City address can be in the city, in Garfield, or in one of several other townships. Your tax bill or the county parcel record shows which. Inside the city limits, see our Traverse City page; elsewhere in the county, our Grand Traverse County guide.

How a Garfield project gets its permits

  • Other agencies first. The township's land use permit application has to come in with the permits it depends on: soil erosion (or a waiver), well and septic from the county health department or sewer and water from the county DPW, a driveway permit from the Road Commission or MDOT, any state (EGLE) permits, and a METRO Fire site plan review where it applies.
  • Land use permit. From the township Zoning Department, 3848 Veterans Drive (231-941-1620). The township says reviews usually take a day or two.
  • Building permit. From the township Building Department, with two sets of plans, the land use permit, the well/septic or sewer permit, the soil erosion permit, and energy code paperwork. Electrical, mechanical, and plumbing permits still come from the county office, which issues them for the whole county.

The township permits

Land use permit. A new structure of 100 sq ft or more (sheds and decks included), any addition, a taller building, a change of use, or grading.Almost every project
Building permit. Houses, additions, and alterations. Not needed for a detached shed under 200 sq ft.Most construction
Soil erosion permit. Issued by the township since 2025.Within 500 ft of a lake or stream, or 1 acre or more disturbed
Stormwater permit. A house can often use a simplified stormwater plan.Within 500 ft of water, half an acre or more disturbed, or steep slopes

A single house, addition, or garage on its own lot doesn't need a stormwater permit when the lot is more than 500 feet from any lake, river, or stream, the work disturbs less than half an acre, and it doesn't touch slopes over 20 percent.

What the township wants to see

For the land use permit, a house or garage needs a site diagram: a dimensioned sketch of everything on the property, the new work, the parcel dimensions, setbacks, the road right-of-way, and building height. The zoning ordinance doesn't require it to be sealed by an architect or engineer.

For the building permit, the township's plan review checklist asks for two sets of drawings to scale: a site plan, a footing and foundation plan with footing depths, floor plans with every beam, header, and joist sized, exterior elevations with grade lines, and a wall section from footing to roof. The township lists a 60 psf ground snow load and 42-inch footings (24 inches in sandy, well-drained soil).

Zoning

Garfield's zoning ordinance sets the numbers below for its main residential districts. Check the township zoning map for your lot's district.

R-1: 15,000 sq ft lots with sewer (20,000 without), 100 ft wideFront 30 ft · sides 10 ft · rear 30 ft · 30% coverage
R-2: 12,000 sq ft lots with sewer (15,000 without)Front 25 to 30 ft · sides 10 ft · rear 25 to 30 ft · 30% coverage
R-R and Agricultural: 1-acre lots, 110 ft wideFront 30 ft · sides 15 to 20 ft · rear 35 ft · 20% coverage
  • Setbacks are measured to the roof overhang. The township measures from the furthest point of the building, so eaves count. On a tight lot that changes where the walls can go.
  • Height: 35 feet and 2½ stories in these districts.
  • Garages and sheds: not in the front yard, at least 10 feet from the rear line, no bigger than the house's ground floor, and one story or 18 feet at most.
  • Water: houses sit at least 50 feet back from lakes and streams, including Silver Lake and Boardman Lake, with a 35-foot strip of native vegetation kept along the shore.
  • Slopes and wetlands: no grading on slopes of 20 percent or more, and nothing built within 25 feet of a regulated wetland. A site with wetlands needs a delineation verified by the state.
  • US-31: outside a recorded subdivision, buildings also stay 100 feet from the highway's centerline.

Things to watch for

  • Silver Lake, Boardman Lake, and the Boardman River. They bring in the water setback, the shoreline buffer, the soil erosion permit, and often the stormwater permit.
  • Hilly lots. The steep-slope rule and the stormwater ordinance both look at slopes over 20 percent, so a sloped site is worth checking before the house is placed.
  • Flood plain. If any part of the house is in the flood plain, the township asks for an elevation certificate and engineered foundation drawings.

Do you need an architect here?

Under Michigan law (MCL 339.2012(1)(d)), a detached one- or two-family home of up to 3,500 square feet of calculated floor area can be designed by someone who isn't a licensed architect or engineer, so you may not need an architect. Michigan Attorney General Opinion No. 7208 (2007) addresses how that floor area is measured; generally only habitable space counts, and basements, garages, porches, decks, bathrooms, closets and hallways don't. Your building department can confirm whether the exemption applies to your project. We take on homes, additions and remodels within that exemption; if yours may fall outside it, we aim to tell you early so you can bring in an architect or engineer. More in our FAQ.

How we help

  • New custom homes placed to fit Garfield's setbacks, measured to the overhang
  • Additions, remodels, and garages, starting with as-built drawings of the existing house
  • A site diagram for the land use permit, drawn from your survey, an existing site plan, or measurements you provide where the township says a survey isn't required. If you need a survey, we'll connect you with our partner, Latitude Planning & Survey.
  • Construction drawings that follow the township's plan review checklist: foundation, floor plans, elevations, and wall sections
  • Early notes on what to check with the township, the county, or the state
Offices, phone numbers, fees and requirements change. This page is based on Garfield Township's published forms, its zoning ordinance, its 2026 stormwater ordinance, and its website as of October 2026. It is a starting point, not legal advice. Confirm the details for your parcel with the township.

Also serving: Traverse City · Grand Traverse County · Leelanau · Antrim · Benzie · Kalkaska