Custom homes, additions, remodels, and site plans for Kalkaska, Rapid City, South Boardman, Excelsior, and the lake and river country in between, with drawings prepared for the offices that will review them.
Here are the offices usually involved, what to ask them, and local conditions that can affect design.
Permits are applied for by the owner or builder. We don't apply for or manage permits.
The Kalkaska County Construction Codes Office, 605 N. Birch Street, Kalkaska, in the county administration building next to the courthouse, 231-258-3365. Ask the office how long permit review takes, and plan for it in your schedule.
The Kalkaska County Planning & Zoning Department, 605 N. Birch Street, 231-258-3367, handles county zoning. Ask the county which zoning applies to your parcel and which permits you need before you apply for the building permit. Call ahead before you visit.
For these townships and the village, start with the township or village. Each link goes to its site or the county's contact list.
| Blue Lake Township | Township site → |
| Boardman Township (South Boardman) | County contact list → |
| Clearwater Township (Rapid City area) | County contact list → |
| Garfield Township | County contact list → |
| Rapid River Township | County contact list → |
| Village of Kalkaska | Developing in the Village → |
Inside the Village of Kalkaska, start with the village for zoning and site plan review; the county can tell you which other permits apply.
District Health Department #10 issues well and septic permits from its Kalkaska office, 625 Courthouse Drive, 231-258-8669. Outside the Village of Kalkaska, many homes are on a private well and septic system. If an addition adds a bedroom, ask them about your septic system before design starts.
The county Planning & Zoning Department is the soil erosion and sedimentation control agency. Ask them whether your project needs a permit, especially near the Boardman and Manistee rivers, Rapid River or the county's inland lakes.
Michigan building departments currently review homes under the 2015 Michigan Residential Code and the state's residential energy code. Check any local requirements with your building department early.
Ground snow load in northern Michigan changes from county to county, and it drives roof framing, truss design, and header sizes. Ask the Kalkaska County Construction Codes Office for the design snow load and frost depth that apply to your parcel before design is finished and before trusses are ordered, and we'll note them on the drawings.
Ask the building department for its current permit checklist before your drawings are finished. It can also tell you which other permits it needs to see first.
Under Michigan law (MCL 339.2012(1)(d)), a detached one- or two-family home of up to 3,500 square feet of calculated floor area can be designed by someone who isn't a licensed architect or engineer, so you may not need an architect. Michigan Attorney General Opinion No. 7208 (2007) addresses how that floor area is measured; generally only habitable space counts, and basements, garages, porches, decks, bathrooms, closets and hallways don't. Your building department can confirm whether the exemption applies to your project. We take on homes, additions and remodels within that exemption; if yours may fall outside it, we aim to tell you early so you can bring in an architect or engineer. More in our FAQ.
Also serving: Grand Traverse · Leelanau · Antrim · Benzie