Not every remodel needs drawings. But more do than most homeowners realize — and skipping them is where a lot of remodel problems start.
The question of whether your remodel needs a drawing set isn't always obvious. A cosmetic refresh — new flooring, paint, cabinet hardware — may not need a permit or drawings; your building department can tell you. But once you start moving walls, changing the structural layout, or altering systems, the calculus changes quickly. Here's how to think about it.
When you're likely to need drawings
Remodels that need a building permit usually need drawings too. Work that often calls for a permit includes changes to load-bearing walls or the structure, plumbing and electrical changes, basement finishing, footprint changes, and changes that affect exits or fire separation. Your local building department decides whether your project needs one, so ask them directly.
The open-concept conversion
Opening up a floor plan usually means removing a wall. This often involves a load-bearing wall — which means it requires a beam or header sized to carry the load above, proper bearing at each end, and a foundation capable of handling the concentrated load. Getting that wrong doesn't show up immediately. It shows up years later in sagging floors, cracked drywall, or a stuck door that won't close. Where a beam is beyond the 2015 Michigan Residential Code's prescriptive tables, a licensed engineer or the engineered-lumber supplier sizes it. Drawings for this kind of work show what's being removed, what's replacing it, and how the loads are being redirected.
Kitchen and bathroom remodels
Layout changes in kitchens and bathrooms — moving the sink, relocating the toilet, changing the shower configuration — often need permits because they involve plumbing changes. Drawings don't need to be elaborate, but they should show what's changing and where the new fixtures go.
Basement finishing
Finishing a basement — framing walls, adding bedrooms, adding a bathroom — often needs a permit, and the drawings typically show the proposed layout, ceiling heights, egress windows for any sleeping rooms, and smoke and CO detector locations. Ask your building department what it wants to see. Unpermitted basement work can cause problems at resale if a buyer's lender or inspector flags it.
When drawings are optional but still worth it
Even for remodels that don't require a permit, a drawing of the proposed layout before demo starts can help. It's easier to change your mind on paper than after the tile is ordered. A floor plan gives your contractor, cabinet vendor, plumber and electrician the same layout to work from.
If you're not sure whether your remodel needs drawings or a permit, reach out. We'll tell you what drawings we'd recommend; your building department decides whether a permit is required.