What Happens If You Build Without a Site Plan in Michigan?

New home under construction on a residential lot

Skipping a required site plan doesn't make the requirement go away — it can move the problem downstream, where it is harder to fix.

Only your zoning administrator can tell you if you need a survey or not for a site plan. A call to your township will tell you, and it may save you the cost of a survey you don't need.

A site plan is a scaled drawing that shows how a building sits on a lot — its footprint, its relationship to property lines, setbacks from those lines, driveway and access, and any other features required by your local building department or zoning ordinance. For new construction and additions that change the building's footprint, a site plan is usually part of the permit application. Here's what can happen when people try to skip it.

The permit can be held up

Where a site plan is required, an application without one may come back as incomplete. That can delay your permit and your construction start, and scheduling problems with your contractor can follow.

You might violate a setback without knowing it

Zoned parcels usually have setback requirements — minimum distances from property lines that structures must maintain. These vary by township, zoning district, and sometimes by which property line you're measuring from (front, rear, side). Without a site plan that plots your proposed building location against reliable property line locations, it's hard to check, and your township may ask for the lot lines and building site to be staked for inspection. Building inside a setback can lead to a zoning violation, and the structure may have to be changed or removed.

Easements and encroachments

Site plans can also show easements — utility corridors, drainage easements, access easements — that can limit where you build. These usually appear in your title work but aren't always obvious on the ground, and building over one can cause problems later, including when you sell.

What a site plan actually shows

A residential site plan typically includes: property lines with dimensions, setback lines, the proposed building footprint with dimensions to property lines, driveway location and width, any existing structures on the lot, north arrow, scale, and the parcel number. Depending on your township and project scope, it may also need to show utility connections, septic system location, or grading information. We don't survey property, so the lines on the plan come from a source you provide: a survey when you have one, an existing site plan, or measurements you take on your lot, when your township accepts a plan drawn that way. A plan drawn that way is not a survey, and we don't locate property lines. If your project needs a survey, we'll let you know right away and connect you with our partner, Latitude Planning & Survey. We never draw lot lines from the county parcel map; it can be far enough off to put a building in the wrong place.

When you may need one

New construction and additions that change the footprint often need one. Accessory structures such as garages, pole barns and larger sheds often do too, and decks and pools can. If you're not sure whether your project requires a site plan, call your local building department or township zoning office.

Do I need a survey to get a site plan?

Maybe not. This is a common point of confusion, because people are often told a survey is always step one. It depends on your township and your lot. Only your zoning administrator can tell you what your permit needs, so call before you order a survey or a drawing and ask about your project on your lot. If the answer is "a scaled plan is fine", a designer can draw it from an existing site plan or from measurements you provide, not from the parcel map. If the answer is "we need a survey", a licensed land surveyor is the first call.

How to get a site plan for your property

Start with what you already have. Look through your closing papers for a recorded boundary survey, and ask your township whether anything is on file for your parcel. Then ask your zoning administrator what your permit needs. For a new home, a waterfront lot, a tight setback, a non-conforming lot or a variance, a survey by a licensed land surveyor is usually the better starting point; only a surveyor can establish your property lines. For a shed, deck, garage or addition well inside the setbacks, a designer can often draw the plan from an existing site plan or from your deed's lot dimensions and your own measurements on the ground, and it's your job to stake the lines for inspection. The county parcel map is not a reliable source for lot lines. Either way, the designer draws the site plan: the building footprint, setbacks, driveway, and other drafting your township asks for. That's what our residential site plan service does; you or your builder submit it with the application.

Before you spend anything, call your zoning administrator. Township forms change, administrators have discretion to ask for a survey, and a lake, an easement or a non-conforming lot can change the answer for your parcel. A call to the township tells you what your permit needs; the rest of this post is the general picture.

If you need a site plan for a permit application, with or without a survey in hand, reach out and we'll scope it out.

Planning a project?

Talk it through on a free call.

Book a free 15-minute call to talk through your project and what comes next. Or send a message with the details.

Book a Free 15-Minute Call →Send a Message →
Related Reading

More from the blog.