Permits · October 7, 2026

Who Issues Building Permits in Northern Michigan?

Floor plan drawings with drafting pencils and a scale

It's often more than one office.

People planning a house or an addition often ask where to "get the permit." In Northern Michigan it's often more than one counter. Zoning, the building permit, well and septic, and soil erosion can be handled by different offices, and which offices depends on the county and the township your lot is in.

Permits are applied for by the owner or builder. We don't apply for or manage permits.

Here is how it breaks down in the five counties we serve.

The order things usually happen in

Grand Traverse County

Zoning is handled locally by the cities, villages, and townships. The building permit comes from Grand Traverse County Construction Code for most of the county. Garfield Township is the exception and runs its own building department. Inside Traverse City, the city issues the land use permit and the county issues the building permit. Well, septic, and soil erosion permits come from the county health department, except that Traverse City and Garfield Township handle their own soil erosion permits. Grand Traverse County guide →

Leelanau County

Zoning is handled by the townships and villages. The building permit comes from the Leelanau County Department of Building Safety in Suttons Bay. Well and septic permits come from the Benzie-Leelanau District Health Department, and soil erosion permits from the Leelanau Conservation District. Leelanau County guide →

Antrim County

In Antrim, ask the county whether zoning applies to your parcel and who handles it. The building permit comes from the Antrim County Construction Code Department in Bellaire, which also handles soil erosion. Well and septic permits come from the Health Department of Northwest Michigan. Antrim County guide →

Benzie County

In Benzie County, zoning is handled by the townships, villages, and the City of Frankfort. The Benzie County Building Department in Beulah issues building permits and soil erosion permits. Well and septic permits come from the Benzie-Leelanau District Health Department. Benzie County guide →

Kalkaska County

The Kalkaska County Planning & Zoning Department handles county zoning. Blue Lake, Boardman, Clearwater, Garfield and Rapid River townships and the Village of Kalkaska have their own zoning contacts, and the county can tell you which applies to your parcel. The building permit comes from the Kalkaska County Construction Codes Office in Kalkaska. Well and septic permits come from District Health Department #10, and the county Planning & Zoning Department handles soil erosion permits. Kalkaska County guide →

Why this matters for your drawings

Each of those offices looks at a different part of the project. The township typically reviews a site plan showing setbacks. The health department looks at things like bedrooms and the septic field. The building department reviews the construction set. Find out what each office wants before the drawings are made.

Offices and requirements change, so confirm the details for your own parcel. If you're planning a project and want to know which offices you'll be dealing with, reach out and tell us where the lot is.

Planning a project?

Talk it through on a free call.

Book a free 15-minute call to talk through your project and what comes next. Or send a message with the details.

Book a Free 15-Minute Call →Send a Message →
Related Reading

More from the blog.